# Kitting in Warehousing: Definition and Examples | Kentro

Source: https://kentro.io/glossary/kitting/
Last updated: 2026-11-17

Kitting is combining separate items into one unit with its own SKU, ready to ship. See the steps, a worked example and kitting vs bundling vs assembly.

## Kitting

Building one sellable unit out of several separate items, before the order arrives.

## What is kitting?

Kitting is the warehouse process of gathering several separate items and combining them into one unit with its own SKU, ready to ship as a single line. A gift set, a subscription box and a starter pack are kits. Kitting moves assembly ahead of the order, so packing is faster and the kit has its own stock count.

## How kitting works

Kitting has four steps.

1. **Define the kit.** List the components and the quantity of each. That list is the bill of materials.
2. **Pull the components.** Pick every part from stock in the quantities the build needs.
3. **Build and label.** Assemble, wrap or box the parts, then apply the barcode of the kit SKU.
4. **Put the kits into stock.** The components leave inventory and the finished kits enter it.

## A worked example

A coffee brand sells a starter kit: 1 bag of beans, 1 box of filters and 1 mug. It has 500 bags, 300 boxes of filters and 240 mugs on the shelf. The part that runs out soonest sets the limit, so it can build 240 kits.

After a build of 200 kits, stock is 300 bags, 100 boxes of filters, 40 mugs and 200 starter kits. The numbers are illustrative.

## Kitting vs bundling vs assembly

| Term | What happens | Stock record |
|---|---|---|
| Kitting | Parts are physically combined ahead of orders | The kit is counted as its own item |
| Bundling | Items are sold together at one price and picked separately for each order | The components are counted, the bundle is not |
| Assembly | Parts are joined into a new product that cannot be sold apart | The finished product replaces the parts |

A bundle is a pricing decision. A kit is a physical one. The same gift set can be either, depending on whether someone builds it before the order arrives.

## Common mistakes

- **Selling kits and loose parts from two counts.** A build of 200 kits must lower the stock of each part at once, or the parts oversell.
- **Building too far ahead.** Parts locked in slow kits cannot be sold on their own. Build to recent demand.
- **No barcode for the kit.** A kit without its own label that scans gets picked as loose parts.
- **Ignoring shelf life.** A kit expires when its shortest-dated component does.

## How Kentro handles kitting

In Kentro OS, a bundle or kit is one product made of other SKUs, and it sells like any other product. A build template holds the bill of materials and a build order runs it: the components leave stock and the finished kits enter it, and both movements land in the inventory log. Build orders are made for kitting and light assembly, not for scheduling a factory floor.

- Bundles and kits with their components
- Build templates and build orders
- Parts and finished kits in the same stock count

- [Build orders and kitting in Kentro OS](https://kentro.io/os/manufacturing/)

## Questions about kitting

### What is the difference between kitting and bundling?

Bundling is a way to sell: several products offered together at one price, picked as separate items when the order comes in. Kitting is a way to prepare stock: the items are physically combined into one unit with its own SKU before any order arrives. A bundle needs no labor until it sells. A kit costs labor up front and ships faster.

### Is kitting the same as assembly?

They overlap, and warehouses often quote them together. Kitting groups finished items that could each be sold alone, such as a razor, blades and a case in one box. Assembly joins parts into a new product that cannot be sold apart, such as attaching a pump to a bottle. Both consume components and add a finished item to stock, so both need a bill of materials.

### What are kitting services at a 3PL?

Kitting services are the special projects a 3PL sells on top of storage and pick and pack: building gift sets, subscription boxes, retail displays or multi-packs from your stock. They are usually priced per kit or per hour of labor, with packaging materials billed separately. Send the 3PL a sample or a photo and the component list, and ask for a quote before stock arrives.

### When should kits be built ahead of orders?

Build ahead when the kit sells steadily, takes real time to assemble, or has to ship the same day. Pick the parts per order when demand is uncertain, when the components also sell on their own, or when there are many kit variations. A common middle path is to build a week or two of expected demand and top up as the kits sell.

## Related terms and pages

- [All glossary terms](https://kentro.io/glossary/)
- [Pick and pack](https://kentro.io/glossary/pick-and-pack/): How a finished kit ships
- [What is a 3PL?](https://kentro.io/glossary/what-is-a-3pl/): Who offers kitting as a service
- [Dead stock](https://kentro.io/glossary/dead-stock/): What slow kits turn into
- [Bill of materials and build orders in Kentro OS](https://kentro.io/os/manufacturing/)
- [Inventory management in Kentro OS](https://kentro.io/os/inventory-management/)
- [B2B and retail fulfillment through the network](https://kentro.io/3pl/fulfillment/b2b-retail/)

## Keep kits and their parts in one stock count

Bills of materials and build orders are part of every Kentro OS plan.

- [See build orders](https://kentro.io/os/manufacturing/)
